ENI – OCTP- GHANA

Project Summary:

Supply TCN-1 Topside Process Packages (6 modules, 2 skids) – including gas compression, gas dehydration and hydrocarbon dewpoint control, gas injection, oil treatment, crude stabilization, flare knockout and a Flare Gas Recovery Module.

Key Facts:

Client:

Yinson west Africa Pte Ltd / End User: ENI Exploration and Production

Challenge:

No central pipe rack was available on the FPSO

VME Solution:

Required fully integrated piping system design to interconnect all the Topsides Modules – which VME successfully completed.