
We support every stage of your project, from beginning to end:
We support every stage of your project, from beginning to end:
We support every stage of your project, from beginning to end:
2*100% trains of flare gas recovery unit (FGRU) consists of gas sweetening and amine regeneration unit for the Wasit gas plant, Saudi Arabia
Engineering, detail design, procurement and supply of proprietary equipment and skids
Client required process solution to remove/reduce carbon dioxide and hydrogen Sulfide from natural gas production from the Arabiyah and Hasbah gas fields in Saudi Arabia.
VME provided technology, process, detail design and proprietary equipment, plus commissioning and start up support.
Call: (903) 561-4082
OR fill out the form on this page
Within 1-2 business days, we’ll connect you with an expert who will learn everything we need to know about your project so you have an accurate quote, projected timeline, and reliable expectations.
We’ll fight for you and your success every step of the way.