98/2 FPSO

98/2 FPSO Project Summary: Bumi Armada/SPOG is providing an FPSO to ONGC, which is developing the New Exploration Licensing Policy (NELP) for Block KG-DWN-98/2 in deep waters off the East Coast of India. The KG-DWN-98/2 block is located within 25-40 km of the nearest landfall and is adjacent to RIL’s KG-D6 field and GSPC’s Deendayal […]

Flare Gas Recovery

Flare Gas Recovery Project Summary: 2*100% trains of flare gas recovery unit (FGRU) consists of gas sweetening and amine regeneration unit for the Wasit gas plant, Saudi Arabia Key Facts: Amine gas sweetening using generic MDEA for gas flow rate of 10,240,000 SCFD at 260 PSIG and 140 degF. Inlet: H2S: 33mole% and Carbon Dioxide: […]

Generic Gas FPSO 1, Cidade De Sao Mateus, Brazil

Generic Gas FPSO 1, Cidade De Sao Mateus, Brazil Project Summary: 3 Topsides Modules – Seawater Treatment (SRU) & Water Injection, TEG Dehydration Module with HP/LP Fuel Gas conditioning, plus Flare Processing Module Key Facts: First ever Gas FPSO for Petrobras in Brazil and was the largest sized FPSO at that time 3 modules, weighing […]

Cachalote Relocation of FPSO Capixaba

Cachalote Relocation of FPSO Capixaba Project Summary: Amine Sweetening Module, 750 Metric Tons Key Facts: This was the first FPSO which was relocated and re-purposed for a new field location, highlighting one of the primary advantages of FPSO’s compared to fixed platform facilities. 1 module, 750 metric tons. Due to the existing space constraint on […]

ONGC KG DWN 98/2

ONGC KG DWN 98/2 FPSO Project Summary: Five topsides modules including Seawater Treatment Module, Produced Water and Utility Module, Gas Dehydration & Hydrocarbon Dewpoint Module, Chemical Injection Module and Metering Laydown Module. (Total weight approximately 5,500 Tonnes). Key Facts: Achieved 2,000,000 manhours without an LTI. Client: SPBAG Armada 98/2 Pte Ltd – Joint Venture between […]

ENI Mexico Area 1 FPSO Project

ENI Mexico Area 1 FPSO Project Project Summary: EPC of the pressure vessels and process internals. Key Facts: Required the use of 4 Production Vessels and 2 Electrostatic Dehydrator/Desalters Client: International FPSO Provider Challenge: Project required 825 cladded vessels and local content for pressure vessel fabrication. VME Solution: Pressure vessel fabrication and internal installation was […]

Standard O2 Recovery Units

Standard O2 Recovery Units Project Summary: Manufacture and package O2 recovery units with multiple standard capacity sizes for a high volume production client’s sale and leasing fleet. Key Facts: Leveraged lean manufacturing process on multi-unit orders for lowest cost supply Collaborative partnership to deliver best-in-class commercial product Client: Environmental Technology Company Challenge: The client needed […]

ENI – OCTP – GHANA

ENI – OCTP- GHANA Project Summary: Supply TCN-1 Topside Process Packages (6 modules, 2 skids) – including gas compression, gas dehydration and hydrocarbon dewpoint control, gas injection, oil treatment, crude stabilization, flare knockout and a Flare Gas Recovery Module. Key Facts: Associated Gas Flow 190 MMSCFD to 430 bara Non-Associated Gas (NAG) Flow 190 MMSCFD […]

Husky Madura FPSO

Husky Madura FPSO Project Summary: Amine gas sweetening for H2S removal, Gas Dehydration Module and Sulfur Recovery Module. Key Facts: Sulfur recovery unit was successfully tested and commissioned and is the first technology of this kind to be operated on an FPSO Total Module weight of the project – 3000 Tons. The SRU module was […]

Baobab FPSO, Cote d’Ivoire, West Africa

Baobab FPSO, Cote d’Ivoire, West Africa Project Summary: HP, IP, LP Separators, Electrostatic Coalescer, Gas Processing Module Key Facts: Processing capacity of the Module – 75 MMSCFD Gas flow rate This project became the springboard for expansion of VME into Asia – particularly on the fabrication of Topsides Modules. VME First: EPC Scope for Offshore […]

We're on your side.

Step one: Contact VME

Call: (903) 561-4082
OR fill out the form on this page

Step two: Confirm we’re the right fit for you

Within 1-2 business days, we’ll connect you  with an expert who will learn everything we need to know about your project so you have an accurate quote, projected timeline, and reliable expectations.

Step three: Achieve your goals

We’ll fight for you and your success every step of the way.