
We support every stage of your project, from beginning to end:
We support every stage of your project, from beginning to end:
We support every stage of your project, from beginning to end:
3 Topsides Modules – Seawater Treatment (SRU) & Water Injection, TEG Dehydration Module with HP/LP Fuel Gas conditioning, plus Flare Processing Module
Petrobras / Prosafe Production
The gas needed to be dehydrated at a very high pressure (201.5 bara). This was the first ever FPSO that was focused solely on Gas Processing, rather than Oil.
VME was able to design and build 3 complete modules in Batam, Indonesia, which required membranes treatment for sulphate removal. Due to the high-pressure operation, this required a very specialized design of the Glycol system, to meet the dehydration performance and minimize glycol losses.
Call: (903) 561-4082
OR fill out the form on this page
Within 1-2 business days, we’ll connect you with an expert who will learn everything we need to know about your project so you have an accurate quote, projected timeline, and reliable expectations.
We’ll fight for you and your success every step of the way.