Amine Sweetening Module, 750 Metric Tons
Petrobras / SBM Atlantia
SBM / Petrobras elected to re-locate the FPSO to a new field called Cachalote. The new field had a high concentration of H2S in the Gas stream which was not present at the original Capixaba location.
EPC Modular solution to add an Amine Gas Sweetening Module to the original FPSO. This design solution allowed the new module to be installed on the existing FPSO and reduced H2S to less than 5.0 ppm and achieved an outlet specification of 0.25 vol% of C02. As this module was not part of the original FPSO design there were a lot of space constraints in order to fit this module onto the FPSO.
Call: (903) 561-4082
OR fill out the form on this page
Within 1-2 business days, we’ll connect you with an expert who will learn everything we need to know about your project so you have an accurate quote, projected timeline, and reliable expectations.
We’ll fight for you and your success every step of the way.