VME

VME

ENI – OCTP – GHANA

ENI – OCTP- GHANA

Project Summary:

Supply TCN-1 Topside Process Packages (6 modules, 2 skids) – including gas compression, gas dehydration and hydrocarbon dewpoint control, gas injection, oil treatment, crude stabilization, flare knockout and a Flare Gas Recovery Module.

Key Facts:

Client:

Yinson west Africa Pte Ltd / End User: ENI Exploration and Production

Challenge:

No central pipe rack was available on the FPSO

VME Solution:

Required fully integrated piping system design to interconnect all the Topsides Modules – which VME successfully completed.

We're on your side.

Step one: Contact VME

Call: (903) 561-4082
OR fill out the form on this page

Step two: Confirm we’re the right fit for you

Within 1-2 business days, we’ll connect you  with an expert who will learn everything we need to know about your project so you have an accurate quote, projected timeline, and reliable expectations.

Step three: Achieve your goals

We’ll fight for you and your success every step of the way.