FPSO Ningaloo Vision, Apache Van Gogh Project, Western Australia
Project Summary:
Supply Gas Dehydration (TEG), Fuel Gas, Inlet Separation and Crude Stabilization Modules , Electrostatic Treaters, Produced Water Treatment and Reinjection Package with IGF (150,000 BWPD).
Key Facts:
- Project completed for the Australian market
- High specification and regulatory requirements
- FPSO Capacity: Oil Flow 63,000 BOPD, Gas Flow 80 MMSCD, Produced Water Flow 147,000 BWPD
Tagged Gas Treatment, Oil Treatment