98/2 FPSO

98/2 FPSO Project Summary: Bumi Armada/SPOG is providing an FPSO to ONGC, which is developing the New Exploration Licensing Policy (NELP) for Block KG-DWN-98/2 in deep waters off the East Coast of India. The KG-DWN-98/2 block is located within 25-40 km of the nearest landfall and is adjacent to RIL’s KG-D6 field and GSPC’s Deendayal […]

P61 Offshore Substation and Electrical Equipment

P61 Offshore Substation and Electrical Equipment Project Summary: Floating (Offshore) Substation, electrical, controls and utility equipment Key Facts: 3 modules, each of approximately 500 tons each, complete with switchboards, bus duct, dry transformers, panel boards, lighting transformers, building HVAC systems. 13.8kV process switchboard, transformers 480kV process switchboard Emergency power generation (Diesel) Lighting systems Telecoms, fire […]

FPSO Cidade de Mangaratiba MV24

FPSO Cidade de Mangaratiba MV24 Project Summary: Injection and Re Generation compressor Packages 3 X LP Compressor Modules, 3 x HP Compressor Modules. 10.2MW / motor. Key Facts: First Project with Mitsubishi -Japan as OEM of compressor First Project that VME has completed the commissioning and load test of the complete compression system 70% load […]

Generic Gas FPSO 1, Cidade De Sao Mateus, Brazil

Generic Gas FPSO 1, Cidade De Sao Mateus, Brazil Project Summary: 3 Topsides Modules – Seawater Treatment (SRU) & Water Injection, TEG Dehydration Module with HP/LP Fuel Gas conditioning, plus Flare Processing Module Key Facts: First ever Gas FPSO for Petrobras in Brazil and was the largest sized FPSO at that time 3 modules, weighing […]

ENI Block 15/06 West Hub FPSO

ENI Block 15/06 West Hub FPSO Project Project Summary: VME designed and supplied an Automatic Backwash Coarse filter designed to remove 98% of particles greater than 100 microns.  The completed unit also includes automatic backwashing with built-in logic and timer with overrides for high differential pressure across the filter.   Each filter is designed with capacity […]

Cachalote Relocation of FPSO Capixaba

Cachalote Relocation of FPSO Capixaba Project Summary: Amine Sweetening Module, 750 Metric Tons Key Facts: This was the first FPSO which was relocated and re-purposed for a new field location, highlighting one of the primary advantages of FPSO’s compared to fixed platform facilities. 1 module, 750 metric tons. Due to the existing space constraint on […]

ONGC KG DWN 98/2

ONGC KG DWN 98/2 FPSO Project Summary: Five topsides modules including Seawater Treatment Module, Produced Water and Utility Module, Gas Dehydration & Hydrocarbon Dewpoint Module, Chemical Injection Module and Metering Laydown Module. (Total weight approximately 5,500 Tonnes). Key Facts: Achieved 2,000,000 manhours without an LTI. Client: SPBAG Armada 98/2 Pte Ltd – Joint Venture between […]

Petrobras P-74 Cessao Onerosa FPSO – E-House

Petrobras P-74 Cessao Onerosa FPSO – E-House Project Summary: Electrical E-House for P-74 FPSO, Offshore Brazil Key Facts: Overall dimensions of the E-House: 28m x 22m x 22m H At 1700 Tons largest E-house ever completed by VME Client: EBR / Seaoil for Petrobras Challenge: Due to the local content requirements, the structure, cable tray […]

ENI – OCTP – GHANA

ENI – OCTP- GHANA Project Summary: Supply TCN-1 Topside Process Packages (6 modules, 2 skids) – including gas compression, gas dehydration and hydrocarbon dewpoint control, gas injection, oil treatment, crude stabilization, flare knockout and a Flare Gas Recovery Module. Key Facts: Associated Gas Flow 190 MMSCFD to 430 bara Non-Associated Gas (NAG) Flow 190 MMSCFD […]

Husky Madura FPSO

Husky Madura FPSO Project Summary: Amine gas sweetening for H2S removal, Gas Dehydration Module and Sulfur Recovery Module. Key Facts: Sulfur recovery unit was successfully tested and commissioned and is the first technology of this kind to be operated on an FPSO Total Module weight of the project – 3000 Tons. The SRU module was […]

We're on your side.

Step one: Contact VME

Call: (903) 561-4082
OR fill out the form on this page

Step two: Confirm we’re the right fit for you

Within 1-2 business days, we’ll connect you  with an expert who will learn everything we need to know about your project so you have an accurate quote, projected timeline, and reliable expectations.

Step three: Achieve your goals

We’ll fight for you and your success every step of the way.