ONGC KG DWN 98/2 FPSO
Project Summary:
Five topsides modules including Seawater Treatment Module, Produced Water and Utility Module, Gas Dehydration & Hydrocarbon Dewpoint Module, Chemical Injection Module and Metering Laydown Module. (Total weight approximately 5,500 Tonnes).
Key Facts:
- Achieved 2,000,000 manhours without an LTI.
Client:
SPBAG Armada 98/2 Pte Ltd – Joint Venture between Shapoorji Offshore & Bumi Armada
Challenge:
Awarded in Sep 2019, the project has faced numerous challenges posed by the emergence and escalation of COVID-19 worldwide; including supply chain disruptions, logistical challenges, closure of facilities, manpower shortage, travel restrictions, financial delays and unknown risks.
VME Solution:
While several organizations chose to discontinue the work awarded during these challenging circumstances, VME has maintained an agile and flexible approach to continue supporting our clients and supply chain in a robust manner while moving the project forward on all fronts. As a result, on 17 Jul 2021, module M90, the metering laydown module became the first module to be installed on FPSO.