Baobab FPSO, Cote d’Ivoire, West Africa
Project Summary:
HP, IP, LP Separators, Electrostatic Coalescer, Gas Processing Module
Key Facts:
- Processing capacity of the Module – 75 MMSCFD Gas flow rate
- This project became the springboard for expansion of VME into Asia - particularly on the fabrication of Topsides Modules.
- VME First: EPC Scope for Offshore packages and Topsides
- VME First: package completed in South-East Asia, namely Indonesia
- VME First: First Module built and integrated into a Singapore FPSO
Client:
Modec / Canadian Natural Resources
Challenge:
Very fast track project for complete module packages.
VME Solution:
Module completion in 34 weeks.
Tagged Gas Treatment, Oil Treatment, Separation