ENI Mexico Area 1 FPSO Project

ENI Mexico Area 1 FPSO Project Project Summary: EPC of the pressure vessels and process internals. Key Facts: Required the use of 4 Production Vessels and 2 Electrostatic Dehydrator/Desalters Client: International FPSO Provider Challenge: Project required 825 cladded vessels and local content for pressure vessel fabrication. VME Solution: Pressure vessel fabrication and internal installation was […]
ENI – OCTP – GHANA

ENI – OCTP- GHANA Project Summary: Supply TCN-1 Topside Process Packages (6 modules, 2 skids) – including gas compression, gas dehydration and hydrocarbon dewpoint control, gas injection, oil treatment, crude stabilization, flare knockout and a Flare Gas Recovery Module. Key Facts: Associated Gas Flow 190 MMSCFD to 430 bara Non-Associated Gas (NAG) Flow 190 MMSCFD […]
Husky Madura FPSO

Husky Madura FPSO Project Summary: Amine gas sweetening for H2S removal, Gas Dehydration Module and Sulfur Recovery Module. Key Facts: Sulfur recovery unit was successfully tested and commissioned and is the first technology of this kind to be operated on an FPSO Total Module weight of the project – 3000 Tons. The SRU module was […]
Baobab FPSO, Cote d’Ivoire, West Africa

Baobab FPSO, Cote d’Ivoire, West Africa Project Summary: HP, IP, LP Separators, Electrostatic Coalescer, Gas Processing Module Key Facts: Processing capacity of the Module – 75 MMSCFD Gas flow rate This project became the springboard for expansion of VME into Asia – particularly on the fabrication of Topsides Modules. VME First: EPC Scope for Offshore […]
FPSO Ningaloo Vision, Apache Van Gogh Project, Western Australia

FPSO Ningaloo Vision, Apache Van Gogh Project, Western Australia Project Summary: Supply Gas Dehydration (TEG), Fuel Gas, Inlet Separation and Crude Stabilization Modules , Electrostatic Treaters, Produced Water Treatment and Reinjection Package with IGF (150,000 BWPD). Key Facts: Project completed for the Australian market High specification and regulatory requirements FPSO Capacity: Oil Flow 63,000 BOPD, […]
ONGC KG DWN 98/2 FPSO Project

ONGC KG DWN 98/2 FPSO Project Project Summary: Five topsides modules including Seawater Treatment Module, Produced Water and Utility Module, Gas Dehydration & Hydrocarbon Dewpoint Module, Chemical Injection Module and Metering Laydown Module. (Total weight approximately 5,500 Tonnes). Key Facts: Achieved 2,000,000 manhours without an LTI Project is ongoing Challenge: Awarded in Sep 2019, the […]