VME

VME

VME Process has been selected by Yinson Production for the supply of process topside modules for the AGOGO FPSO. The AGOGO FPSO will be operated in the West Hub field of Block 15/06, approximately 180 kilometers off the coast of Angola. The Agogo Integrated West Hub Development Project is operated by Azule Energy, together with its Block 15/06 partners, Sonangol P&P and SSI Fifteen Limited.

VME Process is responsible for the EPC and pre-commissioning of process modules for high pressure separation, low pressure separation, produced water treatment, closed drain skid, seawater treatment and injection.

The FPSO will have capacity for 120,000 BOPD of oil production, 230 MMSCFD of gas production and 120,000 BWPD of produced water.

Our project management team is based in our Kuala Lumpur Malaysia offices and fabrication of the modules will be executed in our Batam Indonesia fabrication yard.

“As we continue to increase our footprint in the supply of process and utility modular topsides for FPSOs, this award from Yinson Production demonstrates we have the expertise and capabilities to provide these modules on a fast track and global basis. Our project management team includes Malaysia, Indonesia and India project centers of excellence” said Eric van Meerendonk, VME Senior Project Manager.

We're on your side.

Step one: Contact VME

Call: (903) 561-4082
OR fill out the form on this page

Step two: Confirm we’re the right fit for you

Within 1-2 business days, we’ll connect you  with an expert who will learn everything we need to know about your project so you have an accurate quote, projected timeline, and reliable expectations.

Step three: Achieve your goals

We’ll fight for you and your success every step of the way.