Central Processing Pipe Modules
Central Processing Pipe Modules Project Summary: Central processing and gathering facilities for midstream client Key Facts: Project started in 2021 Client: Major Midstream Company Challenge: Traditional “stick built” construction of central gathering facilities is subject to weather delays, cost over runs from a variety of factors (supply chain delays, weather, quality rework). VME Solution: Pre-fabricated, […]
ESP Multi-Well Manifolds
ESP Multi-Well Manifolds Project Summary: Build-to-stock program of standardized multi-well manifolds. Key Facts: Lean manufacturing process for pipe fabrication assures lowest cost supply. Build-to-stock program assures 100% on time delivery Scope: Engineering (drawings, cost reductions, additional design configurations); procurement; fabrication Client: Major Independent Producer in Permian Basin Problem: Client struggles with construction planning and scheduling […]
Standard O2 Recovery Units
Standard O2 Recovery Units Project Summary: Manufacture and package O2 recovery units with multiple standard capacity sizes for a high volume production client’s sale and leasing fleet. Key Facts: Leveraged lean manufacturing process on multi-unit orders for lowest cost supply Collaborative partnership to deliver best-in-class commercial product Client: Environmental Technology Company Challenge: The client needed […]
Electric & Natural Gas Coolers
Electric & Natural Gas Engine Driven Gas Coolers Project Summary: Build electric, and natural gas (NG) engine driven, gas coolers to supply clients in high pressure gas production with the option to either purchase or lease the equipment. Key Facts: Standardized design Quality components Service and Maintenance Client: Two independent operators in Haynesville region Challenge: […]
Facility Program Orders – Major WTX Producer
Facility Program Orders – Major WTX Producer Project Summary: Supply client in the Permian Basin with Center Tank Battery (CTB) and Instrument Air Modules. Key Facts: Robust planning, MRP, and Quality Systems Manufacturing and construction standards that meet industry codes and client specifications Service – installation and start up of instrument air (Cortex) Client: Major […]
Three Phase Separator Program
Three Phase Separator Program Project Summary: Supplied 100 Three-Phase Heated Separator Packages for a client in the Permian and D.J Basin. Key Facts: 100 unit order Cold weather unit 48”-20’ heated three phase separator Target basin – DJ Client: Major Integrated Oil Company Challenge: The client needed more equipment in order to fulfill their annual […]
ESP Multi-Well Manifolds
ESP Multi-Well Manifolds Project Summary: Build-to-stock program of standardized multi-well manifolds. Key Facts: Lean manufacturing process for pipe fabrication assures lowest cost supply Build-to-stock program assures 100% on time delivery Client: Major Independent Producer in Permian Basin Challenge: Client struggles with construction planning and scheduling of multiple piping configuration for tying in production wells to […]
Multi-Well Modules
Multi-Well Modules Project Summary: This is an ongoing (2015-2021) project in which VME has been hired to manufacture and deliver multiple prefabricated well site modules to the Permian and D.J. Basin. Key Facts: Customer partnership Coordination with construction contractors 50% reduction in time to first oil No weather delays during fabrication Higher quality product (controlled […]