VME has been selected by Keppel to provide a gas dehydration & TEG regeneration package (GDU) for P-78 Búzios FPSO Project off the coast of Brazil.
The gas dehydration & TEG regeneration has a gas inlet flowrate of 318.56 MMSCFD with inlet water content 93.55 lbs/MMSCF and outlet water content 2.0 lbs/MMSCF. The Lean TEG purity is 99.95%.
“This is a great opportunity for us to support an exciting new project in the world’s largest deep-water oilfield,” said Daniel Johnstone, Vice President of Offshore Projects. “We look forward to adding our experience and technical expertise toward a successful delivery.”
The P-78 Búzios FPSO is a new project to be designed and constructed for use at Búzios Field, off the coast of Rio de Janeiro. The main boundary conditions and the overall processing plant capacities are described as follows:
- Oil flowrate is 180,000 bpd
- Liquid flowrate is 200,000 bpd
- Produced water flowrate is 150,000 bpd and 7.2 million m3 of gas daily with 25 years long term production operation
- Overall storage capacity is 2,000,000 bbl oil storage