Project Profile

MODEC TUPI 5 & TUPI 6 FPSOs
Client

Modec Toyo Offshore Production Systems Pte. Ltd.

Completed

Tupi 5 – November 2013

Tupi 6 – May 2014

Operator

Petrobras

Field Location

Offshore Brazil

Scope of Supply

  • Chemical Injection Module

Design Specifications

  • Wellhead and Topsides Chemical Injection Module (580 MT)

Key Accomplishments

  • Tupi 5 – constructed in Brazil

  • Tupi 6 – constructed at VME in Batam, Indonesia

Tupi 5

Tupi 6

Talk to an Engineer or Product Manager Get in Touch Now